Secured Trading Service

Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance

  • Audited Supplier
  • 2 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • High-Strength Material: Constructed from premium Q235 or Q345 carbon steel for superior durability.
  • Corrosion Resistance: Hot-dip galvanized or powder-coated finish for long life in harsh conditions.
  • Modular Design: Fast erection and dismantling system to increase on-site productivity.
  • High Load Capacity: Designed for heavy-duty applications in construction and infrastructure.
  • International Compliance: Meets EN 74, BS 1139, AS/NZS 1576, and OSHA safety standards.
  • Customizable Colors: Available in Silver, Blue, Yellow, or customized color options.
  • Custom Length Options: Standard lengths from 1.0m to 3.0m with custom length availability.
  • OEM/ODM Service: Full customization from designs or samples with skilled engineering support.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance

Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance pictures & photos
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
  • Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
    Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance

Find Similar Products

Product Description

Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Product Description
scaffold
Our scaffolding system is a high-strength, durable, and versatile temporary structure widely used in building construction, maintenance, and infrastructure projects. Made from premium Q235 or Q345 carbon steel, the scaffolding components are precision-engineered to ensure stability, safety, and ease of installation on demanding job sites.
Available in various types including frame scaffolding, ringlock scaffolding, cuplock scaffolding, and tube & coupler systems, our products are compatible with international standards and suitable for use in residential, commercial, and industrial construction environments.
Each component is hot-dip galvanized or powder-coated for excellent corrosion resistance, ensuring long service life even in harsh outdoor or coastal conditions. The modular design allows for fast erection and dismantling, helping contractors reduce labor time and increase on-site productivity.
Key Features
Made of high-quality Q235/Q345 carbon steel
Hot-dip galvanized or powder coated for anti-corrosion protection
High load-bearing capacity and structural stability
Modular and reusable system, easy to transport and assemble
Complies with international scaffolding safety standards
Widely used in construction, bridgework, shipbuilding, industrial maintenance, and high-rise projects
Applications
Building and bridge construction
Concrete slab and beam support
Facade renovation and exterior work
Industrial plant and warehouse maintenance
Infrastructure projects like railways and tunnels
Product Types
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
More Scaffolding
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Specification
Product Name
Steel Scaffolding System
Material
Q235 / Q345 Carbon Steel
Tube Diameter
48.3 mm / 60.3 mm
Wall Thickness
2.0 mm / 2.5 mm / 3.0 mm
Length Options
1.0 m / 1.5 m / 2.0 m / 2.5 m / 3.0 m / Custom Length
Surface Treatment
Hot-Dip Galvanized / Electro-Galvanized / Powder Coated
Color
Silver / Blue / Yellow / Customized
Coupler Type
Fixed Coupler, Swivel Coupler, Sleeve Coupler, Putlog Coupler, Half Coupler
Standard Compliance
EN 74, BS 1139, AS/NZS 1576, OSHA
Application
Building Construction, Formwork Support, Facade Access, Industrial Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Company Profile
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
About Us
Zhite Building Materials Business Center specializes in squarecolumn buckles, steel pipe bases,steel supports, hollow topsupports, suspended beam fasteners, mobile scaffolding andother products.Having skilled quality control personnel andworkers, both style and quality are worth your choice.
Our Factory
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance
Packing & Delivery
Factory Supply Heavy Duty Galvanized Mobile Frame Scaffold Aluminum Scaffolding with Strong Load Capacity for Building Maintenance

About the Supplier

This supplier has been audited by CTI. Verify the report on the official CTI website with ID "QIP-ASI256120". Items marked "verified" are certified.

Watch Video
Watch Video
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
Adhebei Cangzhou City Xianxian County Hecheng Street Town West Eight Book Tun Village North, Cangzhou, Hebei, China
verified Plant Area
2500 square meters
verified Number of Employees
20
verified Registered Capital
500,000 RMB
Terms of Payment
T/T, LC, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CPT, CIP
Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
verified Minimum Order Quantity
1000pcs
verified Supply Chain Partners
7

Our Production Capability & Technical Expertise

Main Products
Scaffolding, Steel Prop, Building Material, Scaffolding Coupler, Scaffolding Clamp, Formwork Accessories, Base Jack, Scaffolding Accessories, Scaffolding Fittings, Scaffold
verified Production Lines
2
verified Production Machines
Wire pressing machine, Metal band sawing machine, Fastener drilling machine, Wire welding machine
verified QA/QC inspectors
2 people
verified Inspection Type for Finished Products
Random inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Finished product checked by packing staff
verified Customization Options
Customization from Designs, Customization from Samples, Minor Customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
1 people
verified Traceability of Raw Materials
No

Our Industry Experience & Global Business Record

verified Year of Establishment
2021-05-17
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
verified Repeat Buyers Choice
30%~50%
verified New Products Launched in Last year
No

FAQ

What materials are used for the scaffolding?
The scaffolding is made from high-quality Q235 or Q345 carbon steel.
Is the scaffolding customizable?
Yes, we offer customization for colors (Blue, Yellow, Green, Silver), lengths, and designs based on samples.
What is the minimum order quantity?
The minimum order quantity is 1000 pieces.
How long does it take to deliver?
The average lead time is within 15 workdays for both peak and off-peak seasons.
What surface treatments are available?
We provide hot-dip galvanized, electro-galvanized, and powder-coated options for anti-corrosion.
Does the product meet international safety standards?
Yes, it complies with EN 74, BS 1139, AS/NZS 1576, and OSHA standards.
What payment terms do you accept?
We accept T/T, LC, D/P, PayPal, Western Union, Money Gram, and small-amount payments.
What is the warranty or after-sales support?
We provide 24-hour online after-sales service for all our scaffolding systems.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now